Projects

VGS can provide a wide range of hydrometric and weather station equipment to meet your project requirements. Data can be transmitted directly to your server via SIM card, Wi-Fi, or satellite communication. You also have the option to upload stored data at a time that is convenient for you.

​

In addition to the supply and installation of hydrometric equipment, VGS offers comprehensive service and maintenance plans to ensure the continued reliability of your systems.

​

We also stock a variety of spare parts at our Hydromet office, ensuring prompt replacement in the unlikely event that a component requires repair or replacement.

Hydrological Monitoring of Xekong 4A&4B Hydropower Project

XK4A & 4B HPP project are located on the Xekong River in Lamam District and Kaleum District at Xekong Province of Southern Lao PDR Apart from monitoring the two hydromet stations on a monthly basis, the team also performing the discharge measurement and upgrade the stations and its staff gauges throughout the monitoring period.

Xekong River Monitoring
 

The Client is considering a few hydropower projects that utilize the abundant water resources of the Xekong River. This is a hydrological investigation on the Xekong River due to obtain hydrological information, which is one of the most important elements of project evaluation.

Feasibility Study for the Pump Hydro

Supply, installation and commissioning of weather and water level stations) is performing a feasibility study into a proposed Pump Hydro plant in the vicinity of its current Nam Theun II reservoir area, part of the study requires several weather and river level stations.

Development of the Gauging Stations​

Development of the Gauging Stations for our clients in 2026 includes surveying, and installing three hydrology gauging station is to improve hydrological data for supporting energy planning and flood forecast for early warning communication to villagers for preparing evacuation to safe zone (Emergency Action Plan Requirement) and improvement of flood mitigation procedure for protection of project facilities.

Establish Various Bore and Surface Monitoring
 

Establish Various Bore and Surface Monitoring Locations in Wetland Close to Vientiane, Laos - Water Surface Monitoring Station -A suitable location within the wetlands area was sought where a small body of water appeared to remain all year round to enable a water level sensor to be installed and maintained with relatively easy access to the site any time of the year.

Construction of staff gauges at 8 villages along downstream Kading river

Construction of staff gauges at 8 villages along downstream Kading river - to identify flood level in case of flooding in the area and is to notify and warning communicate to villagers for preparing evacuation to safe zone (Emergency Action Plan requirement as DESM comment at least one staff gauge for a village).

Installation 2 Hydrological Gauging Station
 

Installation 2 Hydrological Gauging Station of Xe Nam Noy 1 Power Sole Co., Ltd 1.XNN1 Upstream hydrological station 2.XNN2 Downstream hydrological station -Installation Rain Gauge measurement XNN1 Upstream -Installation Radar Water level for 2 hydrological stations -Modify fence for protection hydrological (XNN1 Upstream and XNN1 Downstream) •Installation staff gauges, benchmark and cross-section 2 stations (XNN1 Upstream and XNN1 Downstream) •Configuration all sensors and auto transfer data of 2 hydrological stations to the client's sever •Gauging measurement during installation one time at (1) XNN1 Upstream hydrological station and (2) XNN1 Downstream hydrological station

Hydrological Gauging Station Installation 
 

Hydrological Gauging Station Installation for Nam Phak Hydro Power Project 1. Makko weir hydrological station. 2.Sakala 6 weir hydrological station. -Installation rain gauge measurement 2 stations -Installation piezometer water level for 2 stations. -Installation power supply, lightning and surge protection. •Configuration all sensors and auto transfer data of 2 hydrological stations to the client's sever.

Cross Section Survey for Xekong River of 
Xekong 4A&4B Hydropower Project

Conducting a detailed river cross-section surveys at four (4) designated locations to support hydraulic modelling, improve model resolution, and reduce uncertainty in flow simulation.

So Many More to Share
Contact Us for a Full List !

VGS Head Office

House No. 2 ST Group Village | Thongphanthong Village | Vientiane 01000 | Lao PDR (Laos)|

Tel: 856 21 416150 |

Email:  sirpbs@yahoo.com 

  • Facebook
  • LinkedIn
VGS, Hydrometric Stations, Staff Gauges, River Discharge and Flow Measurement, Sediment Sampling, Boats and Field Operations

VGS Survey Yard and Survey Office

Norsavang Village | Sikhottabong District |